Page 55 - RotF - Electrical Specification_Neat
P. 55

GENERAL ELECTRICAL SPECIFICATION
                                 Version 2014-2



                         Where cables are run in trenches they shall be installed at a constant depth of 600mm
                         below finished ground level. The Electrical Contractor shall be responsible for ensuring
                         these cables are back-filled with over 100mm cover of stone free grade earth. The
                         Electrical Contractor shall install a continuous warning marker tape 250mm below
                         finished ground level along the full length of the cable route.

                         No joints will be permitted along the cable run.

                         Any covering removed to facilitate termination’s shall be made good by taping the gap
                         between the LSF sheath and the termination and by extending the tape over the gland.
                         The tape shall be applied “half lapped” and shall overlap the  LSF  sheath. Plastic gland
                         shrouds shall be fitted to all taped areas and  LSF sheath and the gland (for external
                         termination’s) and fitted to extend over  LSF sheath and the gland (for internal
                         termination’s). Gland shrouds shall be slotted over the cable before the gland is fitted.

                         When the termination is made into external lighting columns and signs the gland shall
                         incorporate a lead washer to ensure a watertight joint between the gland and the cut-out.
                         Steel wire armour will be used as the protective conductor. Care shall be taken at all
                         termination’s to ensure that the earth continuity is maintained. All glands, earth tags etc.
                         shall be fitted and tightened to the manufacturer’s recommendations. The earth tag shall
                         be firmly fixed to the switch gear/equipment via a brass nut, bolt and shakeproof washer.

                         A protective conductor shall be connected and installed between the brass bolt and the
                         earthing terminal of the switch gear/equipment.
                         Where cables pass through wall, floor ceilings etc. the holes shall be made good with
                         incombustible material to prevent the spread of fire.

                         Where the walls, floors etc. form a fire barrier  the cables shall be enclosed in a steel
                         sleeve and the space around the cable in the sleeve shall be plugged with insulating
                         material (IET Regulation 527-02).

               2.8.3  FP200 Cable

               2.8.3.1  Material

                         As manufactured by Pirelli General Works Ltd FP200, the cable shall be 300/500v grade,
                         having plain annealed copper conductors, silicon rubber insulation, aluminium foil screen
                         and hard PVC sheath to BS 7629.

               2.8.3.2  Installation

                         Cables shall be installed neatly running truly vertical, horizontal or parallel with the
                         features of the building and shall not be installed closer than 150mm to any other non-
                         electric service.

                         Multiple runs of cable shall be installed without cross -overs.