GENERAL ELECTRICAL SPECIFICATION
                                 Version 2014-2



                          •  Suspended ceiling primary grid system (one bond per area of ceiling required)
                          •  All kitchen equipment, at the point of electrical supply
                          •  Counter
                          •  C.I. Drainage

                         The  Electrical Contractor shall carry out test  to verify that all metal to metal joints in
                         mechanical systems i.e. pipe work, ductwork etc., are electrically continuous and of

                         negligible impedance and report any failures in writing to the Project Manager, for further
                         instructions.
                         All supplementary bonding conductors shall be not less than 4sq.mm copper LSF insulated
                         6491B cable with green/yellow insulation.

                         Warning notices shall be provided in accordance with BS 7671.

                         The Electrical Contractor’s attention is drawn to the requirements of BS 7671 chapter 41.