Page 9 - LINK - Workflow - B3937-AEW-XX-XX-R-A-001
P. 9

DOMINO’S PIZZA GROUP                                                                                                                               AEW ARCHITECTS











       If there are no conditions to discharge then this scenario could save 12 weeks from the   Risk in this scenario is increased to conflict between the Stage 2, 3 + 4 steps. The
       current workflow, resulting in a 24 week process. Where conditions are required to be   maximum financial value of this risk would be the cost of completing Stage 2 and all of 3
       discharged then this scenario would save 3 weeks from the current workflow, resulting in   + 4 for a second time. Architecturally this could range between £3,455 – £4,175 but other
       a 33 week process.                                                              professional fees should be considered such as external Planning Consultants, LPA fees
                                                                                       and Structural Engineers.

                                                                                       This system would NOT allow DPG to remain anonymous through the change of use
                                                                                       application process.


 TASK / WEEK  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32    33     34     35     36
 NSC

 STAGE 1  Measured survey
 Feasibility scheme
 Site briefing meeting
 Updated prelim and briefing minutes
 Franchisee approval

 STAGE 2  Production of change of use information
 LPA COU application (av 10 weeks)

 STAGE   Shopfitting drawings
 3 & 4  Building regulations application
 Advertisement application
 LPA advertisement application (av 10 weeks)
 ‘Other’ applications (listed building)
 LPA ‘other’ application (av 10 weeks)
 Condition discharge
 LPA ‘condition discharge’ (no fixed timescale)

 STAGE 5  Pre start meeting
 Mobilisation
 Start on site
                                                  STAGE 5: 4 WEEKS

          STAGE 2 / 3 + 4 OVERLAP
                                                                                                                                                                   9
   4   5   6   7   8   9   10   11   12   13   14