Page 284 - CRS Engineering
P. 284
r
Annexure II
DESCRIPTION
S NO REMARKS
General Particulars of RAT
1
1 Name of the Tank Gangineni Cheruvu
2 Tank ID No. CHCm 002000PAK
2 District Chittoor
Name of the village & mandal Chittoor. CHITTOOR fM)
3
4 Latitude & Longitude 13°-12'-20"&79°-08'-35"
5 Affected Railway Bridge & KM 548 KM 40 / 6-8
6 Railwav Section & between sections Chittoor-Siddampalle
Distance from Railway Bridge towcir (along the course ofNallah) 1.00 KM
7
Standard Hydraulic particulars
II
Catchment Area 5.83 sq.km
1
Capacity' of the Tank 9.53 Mcft.
2
Lowest bed level 310.68
3
4 Full Tank Level (FTL) (M) 316.38
Maximum Water Level(MWL) (M)
5 316.88
6 Danger Level (DL) 316.88
7 Top of Bund Level (TBL) (M) 317.80
8 Top width of bund (M) 3.70
9 Side slopes frontl.5:l&rear2:l
10 Area of submergence at FTL
11 Area of submergence at MWL
12 Are there any tanks in the catchment of this tank 4Nos
13 Are there any tanks also classified as RATs? No
14 Names & Details of these Tanks
III Surplus weir
1 No of surplus weirs one
2 Lenghts of surplus weirs (M) 24.30
3 Type of surplus weirs Masonry
4 Design Discharge 892 cusecs
IV Sluice
1 No of sluices 3.00
2 Location of sluices
3 Maximum Design Discharge
4 Functional or not
closed
V A) Inspection Details
1. Date of Inspection
12-02-2020
2. Name & Designation of Inspecting Officials 1.Sri G.Prasanth AEE, Irrigation Section Chittoor (IVI)
2.Sri P.Prathapa Reddy, DEE, ISO CTR
3.Sri M.N.Krislinappa, ADEN/Pakala
4.Sri V.Dhamu Raju, SSE/PWAY, Chittoor
3. If the tank qualify for classification as RAT
Yes
B) Tank Bund
1. Is the top level of bund uniform and as per the standards
Yes
2. Is the top width of the bund as per the standards
Yes
3. Are the slopes as per standards
Yes
4. Any Dangerous gullies source of the bund
No
C) Surplus Weir
1. Condition
Fair
2. Is the length adequate for Design Discharge
Yes
3. Is danger level marked?
D) Condition of sluices
closed
E)Any past history of breach of the tank and if so details?
No
REMARKS:tank is in good condition
fSrytjzjtXaL.
n^^Exl gmeet
Assistant Executive Engineer ^ S«2t) Dh'i8ion,ceTrroOR
Irrigation Section,Chittoor. &oc^t DWt.