Page 58 - RFQ 01-2020 MHRA Kimball Street Warrenstreet Qualifications Statement
P. 58

River’s Edge Affordable Housing

            Construction Administration Services

            Laconia, New Hampshire



























            Warrenstreet  provided  final  design  and  construc!on  administra!on  services
            for a 32-unit housing project built on a former mill/warehouse site along the   Owner
            Winnipesaukee River in downtown Laconia. Prior to Warrenstreet’s involvement   Lakes Region Community Developers



            in the key components of the effort involved demoli!on of the former exis!ng
            building;  remedia!on  of  coal  ash  contaminated  soils;  addressing  unknown   Reference


            hazardous material contamina!on; severe grade changes with varying bearing   Sal Steven-Hubbard



            condi!ons  from  ledge  to  rammed  earthen  piles  and  nego!a!ng  NHDES   Real Estate Development Director
            permi%ng while keeping within !ght budget constraints. The 3-story brick and   603.524.0747 x109



                                                                                     sstevenhubbard@laclt.org

            clapboard style building nego!ated the 30-foot slope from the public road to

            the river’s edge providing an aesthe!cally pleasing facade facing the city center   Comple on Date


            on the river side and a single story eleva!on along the busy, mixed-use public   2016

            street.    This  project  followed  responsible  water  management  prac!ces  in

            providing a riparian buffer zone along the river’s edge to protect the river and   Project Size
            through the use of Filterra tree boxes along the public street and 32-car parking   41.000 SF, 32-Units

            lot  situated  below  to  treat  storm  water  runoff.    The  helped  in  this  effort  by



            gran!ng a condi!onal use permit to allow for a lower parking density on the site   Project Cost
            to reduce the overall impervious surface coverage on site due to its proximity   $5.3M
            to amble public parking. Upon Warrenstreets involvement following departure   Project Team
            of  the  previous  Architect,  despite  it’s  many  unique  challenges  the  project   Architect / George Hickey / Warrenstreet
            proceeded forward with a groundwater and soil management plan in hand and   Civil  / Northpoint Engineering
            redesigned founda!ons and geo-piers to support the building. In addi!on to 32   Structural  / Lombard Engineering


            units of fully accessible affordable housing, a licensed daycare and an extension   MEP / WV Engineering

            of the city’s public WOW Riverwalk system were also incorporated. The design   Environmental / TLCM Engineering


            of the building provides tenants with ameni!es including 100% visitable units   Contractor / Eckman Construc!on, Inc.
            (accessible  to  those  with  or  without  physical  disabili!es),  laundry  facili!es,


            tenant and community common areas.