Page 71 - Best Practice for Construction Projects
P. 71
Control of lifting operations / crane set up
• All cranes must be operated by trained CSCS
personnel
7.Lifting and Transporting Operations
• Ensure the lift plan is developed by the Appointed
person for cranes. The lift plan must be approved
by the PSCS.
• The crane will have its annual and 4 year
certification. All lifting accessories will have
certification.
• All cranes must be visually inspected after set up
and before each use and a recorded weekly
inspection using a GA2 form performed.
• The exclusion zone will be set up with barriers
and Signage & will adequate for the Planned lift.
• There will only be one lifting accessory on the
hook block.
• Appropriate tag lines will be used on all lifts.
• The air horn will be activated prior too and during
the lift.
• The Slinger / Signaller will have a direct means of
communication with the crane operator.