CHAPTER 2




            LINK OF WILDLIFE STUDY AND
            WMP IN EIA


            2.1 INTRODUCTION

            As indicated above, this Guidance shall be read
            along with the Environmental Impact Assessment
            Guideline in Malaysia (EIAGM) (DOE, 2016) and
            Guidance Document for Preparation and Submission
            of Environmental Management Plan (EMP) (DOE,
            2010). The EIA procedures described by the EIAGM
            shall be followed except at specific activities. The
            jurisdictions for monitoring of the process and
            approval shall be made by the Department of
            Wildlife and National Parks (PERHILITAN) as allowed
            under EQA, 1974 (Act 127) Delegation of Powers
            Order (to PERHILITAN).

            The general overview of EIA and EMP procedures in
            Malaysia is shown in  Figure 1.1. The activities
            adopted by PERHILITAN as part  of EIA and EMP
            procedures in Malaysia are shown in Figure 2.1. Four
            main focal activities fall under the jurisdiction of
            PERHILITAN. The first activity is to review the TOR
            for wildlife study after submission by the proponent
            and the approval of the  TOR for wildlife  study
            according to the  Guidance Document of Wildlife
            Study  for  EIA  done  at  the  TORAC  Meeting.  The
            review of TOR for wildlife  study at the TORAC
            Meeting is only applicable for an EIA project that
            falls under Schedule 2. However, close engagement
            between proponent/consultant and PERHILITAN is
            advised to pursue a mutual understanding and
            agreement of TOR for the wildlife impact study if an
            EIA project falls under Schedule 1. The next three
            activities taken from the flow of the general EIA
            procedure for monitoring and enhancing the
            mitigation process are Wildlife Study for EIA,
            Wildlife    Management       Plan    (WMP),     and
            Enforcement of WMP (Figure 2.1). The process and
            procedures adopted by PERHILITAN are described
            in Section 2.2 for Wildlife Study in EIA, Section 2.3
            for  Wildlife Management Plan (WMP) Document,
            and Section 2.4 for WMP Enforcement.