P. 10

The  broad  Scope  of  Work  for  TCE  under  the  said  Technical  Assistance
                      Assignment is documented below:

                       1.        Review and amendment of “Uttarakhand Waste to Energy Policy – 2018
                          (draft)”


                       2.        Preparation  of  Detailed  Project  Reports  (DPRs)  for  land  reclamation/
                          capping of identified existing dumpsites


                       3.        Preparation of DPRs on Integrated Solid Waste Management (ISWM) for
                          identified Clusters


                      In  the  above  context,  the  “Draft  Detailed  Project  Report  -  Land  Reclamation  of
                      Existing  Municipal  Solid  Waste  Dumping  Ground  at  Rishikesh,  Uttarakhand”  is
                      being  submitted  in  the  form  of  this  document.  This  Report  elaborates  on
                      observations of TCE on dumping ground based on site visit and interactions with
                      RNN officials, the results of proposed surveys/ investigations, technology screening
                      for  land  reclamation  of  dumpsite,  the  methodology  and  costing  of  selected
                      technology.

                 1.2.1 SCOPE OF WORK:
                      TCE Scope of work includes:

                       1.   Site visit and investigation of existing MSW Dumpsite of RNN at Govind nagar.
                       2.    The primary data collection of existing dumpsite available with RNN.
                       3.   Quantitative assessment of existing legacy waste at Govind nagar Dumpsite
                       4.   Qualitative  assessment  of  existing  legacy  waste  at  Govind  nagar  Dumpsite.
                              (Physical and Chemical characterization )
                       5.   Preparation of DPR comprising
                              a)  Assessment of waste
                              b)  Analysis & selection of Technology/ Process
                              c)  Application of Technology/ Process
                              d)  Estimation of proposed technology/process

                 1.2.2 OBJECTIVES OF THE PROJECT:

                       The main objectives of the proposed project are as follows:
                       a)  The main objective of the project is “Preparation of Detailed Project Report (DPR)
                          for reclamation of existing municipal solid waste dumped at dumping ground
                       b)  Provide  environmentally  safe  and  sustainable  solution  to  handle  the  dumped
                          waste
                       c)  To improve environmental condition at dumping ground
                       d)  To reclaim the land

               1.3 APPROCH AND METHODOLOGY
                 1.3.1 APPROCH

                       A brief step by step approach for the present assignment is described below Table
                       1-1:




                                                                                                        10
   5   6   7   8   9   10   11   12   13   14   15