Page 11 - DPR Rishikesh Legacy_Neat
P. 11

Table 1-1: A brief step by step approach with scope for TCE is summarized

                      Step           Activity                               Details
                        1     Baseline Study                Site  Visit  to  dumping  ground  and  ULB  for
                                                            collection of available data.
                                                            Overview  of  solid  waste  dumped  at
                                                            dumping ground.
                        2     Data Analysis                 Quantification  &  Characterization  of  the
                                                            waste dumped at dumping ground
                        3     Technology Evolution          Screening  and  Identification  of  best
                                                            suitable process for reclamation
                                                            Screening  of  technology  on  the  basis  of
                                                            Modularity, Scalability and Flexibility
                        4     Treatment  Technology         Finalization of treatment technology on the
                              Finalization                  basis of data available and suitable for the
                                                            solid  waste  composition  and  meeting  the
                                                            legal compliance.
                                                            Approval  of  technology  &  scheme  from
                                                            UDD and UUSDIP.
                        5     Preparation  of  Cost         Cost estimation for proposed process
                              and DPR                       Preparation  of  DPR  with  layout,  cost  and
                                                            treatment technologies etc.


                 1.3.2 METHODOLOGY
                      TCE  conducted  the  site  visits  of  the  dumping  ground  and  had  meetings  with
                      authorities in Rishikesh Nagar Nigam (RNN) at various intervals. Information about
                      existing  dumping  ground  practices  were  collected  in  consultation  with  RNN
                      officials.

                      The  qualitative  and  quantitative  assessment  of  waste  was  carried  out  vide
                      methodology given under CPHEEO manual.
                      The detail methodology adopted for DPR is given in Table 1-2

                               Table 1-2: The Methodology in-line with scope for TCE is summarized

                       Sr.            Scope                   Methodology                  Remarks
                       No.
                            Task 1: Meeting with UDD, UUSDIP, RNN and Stakeholders
                            Task 2: Reconnaissance Site Visit for the dumping ground
                      1.        Study of dumped      Assessment    of   dumped           --
                                legacy waste          legacy  waste’s  quantitative
                                                      & qualitative characteristics
                            Task 3: Analysis and evaluation of existing situation of dumping ground
                      1.        Study the current     Consultation with RNN  and  Ascertaining  the
                                scenario of waste     collection of all the relevant  quality     and
                                dumping               data related to solid waste    quantity of waste.
                                Data may also be     Site visit and data collection
                                collected    from     from  various  agencies  for
                                relevant  site  and   solid  waste  in  order  to
                                identify   further    assess  the  quantity  and



                                                                                                        11