Page 205 - BASIC GUIDELINE FOR QS
P. 205
Quantity Surveying: Guideline for Quantity Surveyor Chapter 6
6. Next price amount on page C/1 will be brought to the pages of the collection
in which the original value of RM 2743.30 to RM 2591.30 is replaced with the
value of using the method described.
7. There are corrections to the total price on page collection will be taken to the
page of tender summary.
8. Upon completion of all remedial work carried out by using the Quantity
Surveyors who habe been otherwise. The main contractor will be invited to
sign (initial( at all the correction have been made.
194