Methodology                                         Comserve operate risk assessments at 3 levels:
                           All aspects of our work will be carried out in a responsible   Generic - these cover the  majority of standard maintenance
                           manner in accordance with our Health and Safety policy   procedures covered by our operatives.
                           document and the Health and Safety requirements of the
                           Client and the Main Contractor.                     Job specific risk assessment - these are prepared for
                                                                               individual jobs where a higher level of risk has been identified
                           Comserve our own operatives supplemented by selected   by the client/  engineer/contract manager or the job is not
                           specialist sub-contract personnel who are fully familiar with   covered by the generic risk assessment.
                           our working practices.
                                                                               Job specific/site  specific risk assessment - these are
                           Specialist  sub-contractors will  also be selected from our   carried out by the attending engineer for jobs falling outside
                           approved lists.                                     the generic risk assessment.

                           Before commencing work on site, all personnel will attend   Communication  of  risk  assessments  is  achieved  via  team
                           an in-house induction seminar to familiarise them with the   briefings, PDA data transfer, toolbox talks or 1-2-1 briefings.
                           project, reinforce our safety procedures and up-date them   Monitoring of H&S procedures is achieved via the contract
                           with our Health and Safety practices. RAMS will be provided   management team carrying out random audits of work. All
                           before the commencement of any work activity by competent   safety procedures are reviewed by our SHEQ Director. H&S
                           staff.                                              policy and processes are reviewed during quarterly H&S
                                                                               meeting chaired by the Managing Director.








                                                                                                                                                                    35