Page 41 - B8773-AEW-XX-XX-PP-A-0001_[P8]_Contractors Manual
P. 41
2.5.5 Ceiling Junction with Sneeze screen
A RAL 7037 powder coated channel should
be installed in the ceiling, flush with the face of
the ceiling tiles, to accept the sneeze glass. This
must line up with the white channel in the wall
and the S/S channel in the top of the slap table
front. The channel should be independently
supported from above and fixed back to the
structural slab.
2.5.5 Ceiling Junction with Sneeze Screen 3 September 2018