Rutgers University

                                    New Chemistry and Chemical Biology Building, Piscataway, NJ
          A. Prior Experience


































         Start Date:  Barr &Barr Start Date – November 2015
         *Barr & Barr was sought out to rectify this project at the construction phase, where our team seamlessly responded and got this project back up and running.
         % Complete:  94%
         Completion Date: November 2017
         Project Manager: Chuck Tatosian (SPM) Brooke Rodgers (MEP PM) Wilton Marto (PM)
         Project Superintendent: Steve Goodwin
         Original Contract Value at Award: $102 M
         Estimated Final Contract Value:  $102.5 M
         % of total cost of project that was abatement and demolition:  >1%
         GSF: 141,000 SF
         Size of the Site in Acres: 3.4

         Description of the actual work the fi rm managed and self- performed:
         Th  is new four story (above grade) Chemistry and Chemical Biology, with a basement and penthouse, will house classrooms,
         administration offi  ces, research laboratories and a 120 seat auditorium.  Th  e lobby doubles as a presentation and gathering space and
         the basement includes specialty imaging facilities.

                •  Th  e structure consists of a concrete wide module joist system and includes architecturally exposed concrete at laboratories,
                  stairways and other interior locations. Th  e mechanical penthouse has steel framing members.
                •  Th  e ground fl oor houses fl exible classrooms, administration offi  ces and a 120 seat auditorium. Th  e lobby doubles as a
                  presentation and gathering space.
                •  Research laboratories and related offi  ce on three upper fl oors include synthetic organic and inorganic chemistry; physical
                  organic and analytical chemistry; and physical, biological and materials chemistry.
                •  Shared specialty imaging facilities are located in the basement. Specialized environmental requirements include EMI
                  mitigation, vibration isolation, acoustics, and temperature and humidity control.

         Th  e Exterior Envelop materials include curtainwall, terracotta rain screen, composite metal panel, precast and dimension stone cladding.