Page 552 - Facilities Master Plan 2016
P. 552

Lodi Unified School District                                           Lodi Unified School District
          Erma B. Reese Elementary School                                        Erma B. Reese Elementary School
          Facilities Master Plan - Total Program Cost                            Facilities Master Plan - Total Program Cost
          Opinion of Probable Cost                                    19-Apr-16  Opinion of Probable Cost                                     19-Apr-16
                        Project Cost Summary (2016$) - Erma B. Reese Elementary School         Project Cost Summary (2016$) - Erma B. Reese Elementary School
                                                       Construction Costs   Total Project                                     Construction Costs   Total Project
          Item                      Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)  Item    Quantity  Unit  Unit Cost  Subtotal  Total  Cost 25% (x 1.33)
           11d Learning Center
            11d.4 Reconfigure Learning Center                1,710 sf  $             237.00 $             405,000  16 Next Generation Classroom Flexibility (Furniture)  $                225,000 $                    225,000
                                                                                   16a Flexible furniture (Per Classroom, Direct Cost)                     15 ea  $       15,000.00 $             225,000
          12 Safety, Security & Campus Control            $             1,660,000 $                 2,208,000
           12a  Remaining asbestos removal             23,510 sf  $                 4.00 $               94,000  17 Technology Infrastructure  $                         -  $                             -
           12b Safety improvements to and/or new parent/bus drop-off areas and parking  Not included in this Facilities Needs Assessment
            12b.1 New Parking Lot              30,625 sf  $               16.00 $             490,000
            12b.3 Entry Plaza                     1,500 sf  $               26.00 $               39,000
            12b.5 New Drop-off Area             15,275 sf  $               18.00 $             275,000  Total Construction/Project Cost (2016$)  $           23,906,000  $31,722,000
            12b.11 New concrete walkways                6,800 sf  $               15.00 $             102,000
           12c Covered Walkway                       640 sf  $               90.00 $               58,000
           12d Exterior lighting to ensure student safety                        1 ls  $       40,000.00 $               40,000  The following items are excluded from this budget:
           12e Safety locks at classroom doors                     25 ea  $             449.00 $               11,000  Utility hook-up fees & City connection fees.
           12f Signage for emergency response and wayfinding                        1 ls  $       32,000.00 $               32,000  Offsite work and traffic signals.
           12g Marquee Sign                               1 ea  $       10,000.00 $               10,000  Land acquisition costs.
           12h Fencing with controlled campus entrances                           Hazardous material surveys, abatement, and disposal.
            12h.2 Decorative Metal Fencing & Gates                   400 lf  $             252.00 $             101,000  Escalation (Costs are in 2016$ calculated to the end of the year).
            12h.3 Rolling Decorative Metal Gate                        1 ea  $       27,000.00 $               27,000
           12i Fire safety equipment, fire alarms and emergency lighting
            12i.1 Fire Alarm System             23,510 sf  $                 5.40 $             127,000
            12i.2 Emergency Lighting             23,510 sf  $                 1.40 $               33,000
           12j New public address/emergency communication
           systems                             23,510 sf  $                 7.60 $             179,000
           12k Intrusion alarms                23,510 sf  $                 1.80 $               42,000
          13 District Support Facilities                  $                         -  $                             -
           Not included in this Facilities Needs Assessment
          14 Outdoor Learning Environments & Quads        $                202,000 $                    269,000
           14b Learning Courts
            14b.2 New Learning Court                9,750 sf  $               20.70 $             202,000
          15 Exterior Play Spaces, Playfields & Hardcourts  $             1,434,000 $                 1,907,000
           15a Kindergarten Play Yard
            15a.1 New Rubberized Surface Play Area                1,400 sf  $               20.00 $               28,000
            15a.3 Shade Structure                 1,200 sf  $               90.00 $             108,000
            15a.5 Resurface & Repair Hardcourts                2,250 sf  $                 5.00 $               11,000
            15a.6 New Hardcourts               12,200 sf  $               11.00 $             134,000
           15b PE Play Yard & Hardcourts
            15a.1 New Rubberized Surface Play Area                4,000 sf  $               20.00 $               80,000
            15b.2 Elementary Play Apparatus                        1 ea  $       63,000.00 $               63,000
            15b.3 Relocate Elementary Play Apparatus                        1 ea  $       18,000.00 $               18,000
            15b.5 Resurface & Repair Hardcourts             17,400 sf  $                 5.00 $               87,000
            15b.6 New Hardcourts               50,275 sf  $               11.00 $             553,000
            15b.8 Basketball Court/Sports Equipment                        1 ls  $       38,000.00 $               38,000
           15c Playfields
            15c.1 Repair Playfields           104,600 sf  $                 3.00 $             314,000


         Prepared by: LPA, Inc. / Cumming                                        Prepared by: LPA, Inc. / Cumming


         6.2       APPENDIX                                                                                                    Facilities Master Plan  523
                   DETAILED COST ESTIMATE                                                                                  Lodi Unified School District
   547   548   549   550   551   552   553   554   555   556   557