Page 29 - Hydro-Hybrid™
P. 29
HYDRO HYBRID™
Installation
Standard Water Manifolds
Locate the following items:
• (1) Section of water hose
• (3) Barbed hose fittings
• (3) Hose clamps.
Water Manifolds Assembly
1) Locate the barbed hose fittings. Secure one to opening on the underside of each manifold. This is
how one manifold will be fed from the other.
2) Secure the other fitting to the end of the vertical manifold. This is the main water feed.
Overhead View
Clamp (typical) Crossbeam Water feed
®
Note: Fittings require a water sealant. We recommend using Teflon tape, pipe dope or an
equivalent.
3) Locate the hose clamps and slide two of them onto the supplied 3/4” water hose, use the water
hose to connect the two manifolds together and slide the hose clamps into position.
Barbed hose
Barbed hose fitting (typical)
fitting (typical)
Hose Clamp
(typical)
Hose Clamp
(typical)
Use Teflon® Tape on the threads of the barbed hose fittings
4) Slide the third hose clamp onto the hose being used as a main water feed and secure the main
water feed hose to the vertical manifold. Slide the hose clamp into position.
1MANUL253 Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681 27