Page 35 - Hydro-Hybrid™
P. 35

HYDRO HYBRID™


                       Installation


                       Cloth

                              7)  Loosen the two lower bolts shown in Figure 8 to approximately 3” out.
                              Note:  All mitter cloth is now 3” wide strips. The length will vary depending on the component in
                                     which the cloth is to be installed.









                                                                                       1-1/8” bolt





                                         Loosen these bolts
                                          and back them out
                                           approximately 3”
















                              8)  Mount one cloth strip onto each of the 1” pegs of the Mitter Wave aluminum end plate in the center
                                 of the machine.
                              9)  Push the Mitter Wave up to hold the inserted cloth piece in place. Repeat this process until all cloth
                                 is installed.
                              10)  Tighten the two loosened lower bolts then the 1-1/8” top bolt.
                              11)  Slide the upper locking collar back into position.
                              Note:  Split in collar MUST be perpendicular to the split of the shaft bearing halves.
                              12)  Snug  upper and lower locking collars tightly against both shaft bearings, and secure them into
                                 place.
                              13)  Repeat this process on the follower racks.
                              14)  Replace the entrance side drive arm and all retainer pins.

















                        1MANUL253         Belanger, Inc. * 1001 Doheny Ct. * Northville, MI 48167 * Ph (248) 349-7010 * Fax (248) 380-9681        33
   30   31   32   33   34   35   36   37   38   39   40