Page 130 - Saber® Installation & Startup
P. 130
INSTALLATION & STARTUP
Chapter 7 Pumping Station / Solution Delivery Module (SDM)
Pumping Station Connections
Distribution Manifold Assembly Connections
This section will explain all feeds to and from the Pumping Stations Distribution Manifold.
3/4” hydraulic hose or stainless steel tubing to
Rocker Blaster / Undercarriage Wash
1” hydraulic hose or stainless steel tubing to
1/4” red poly-flow to
Wall Manifold
Pneumatic Manifold 07
1/4” orange poly-flow to
Pneumatic Manifold 05
1/4” black poly-flow to
Pneumatic Manifold 06 Optional
3/4” water hose to SDM
If Reclaim Option:
Rotate the Unloader Valve 90°
and dump bypass water to Drain
1” hydraulic hose to
Main Pump
Pressure gauge
7-6 Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 1MANUL290