Page 73 - Saber® Installation & Startup
P. 73
INSTALLATION & STARTUP
Chapter 6 Frame and Carriage Assembly
Frame Assembly (Wall Mounted)
Installing the Crossbeams
The following steps are for a “standard” 164” Crossbeam. In a scenario where the Crossbeam has
to be cut to fit the bay width, the end goal is to have the rails centered on the Crossbeams with the
proper spacing between them.
1) Locate the 2 Crossbeams and position them into place as shown below. You will have to loosen the fasteners
on the clamps to do so.
This dimension is for
23-5/8”
standard installations
This dimension is the
operating spacing from
95-1/4” inside surface to inside
surface of the two rails
Centerline
12” This dimension allow
off-center 107-1/4” extra spacing to
mount the carriage
onto the rails
Position this rail 12” off-center to allow space to lift the Carriage onto the frame
1MANUL290 Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681 6-11