Page 1161 - Foton Workshop Manual - Auman EST-M
P. 1161
Brake system – service brake (air pressure) BR-29
5. Installation of air cylinder IN
a. Install the U-shaped bolt as well as the inside and
DI
outside air cylinder assemblies under the battery housing.
b. Install the air cylinder U-shaped bolt's fixing nut and
tighten it. EG
Torque:49~59N•m
Caution TR
It shall be installed in the way that the water drain
valve is in the lowest position. AX
FR
c. Install all the air pipes of the air cylinder according to
ST
the marks made when removed.
BR
BW
EL
6. Install the battery assembly. See Change, Clutch Pedal, Clutch, Chapter TR Transmission and
Control Mechanism.
7. Start the engine and check the pressure of braking system
BR-029

