Page 1288 - Foton Workshop Manual - Tunland (AT)
P. 1288
11-62 ENGINE CONTROL SYSTEM - ENGINE PREHEATING SYSTEM
11 10 . Screw out the fixing bolts of the EGR
connecting pipe bracket and the
connecting pipe, and take down the EGR
connecting pipe assembly.
11 . Remove the inlet pipe joint.
(a) Screw out the fixing bolts of the inlet pipe joint,
and take down the inlet pipe joint.
(b) Remove the gasket ring from the inlet pipe
joint.
12 . Screw out the fixing bolts and the bolts
module, and take out the inlet heater.
Page 1288