Page 1288 - Foton Workshop Manual - Tunland (AT)
P. 1288

11-62              ENGINE CONTROL SYSTEM - ENGINE PREHEATING SYSTEM

      11                                              10 .   Screw out the fixing bolts of the EGR
                                                             connecting pipe bracket and the
                                                             connecting pipe, and take down the EGR
                                                             connecting pipe assembly.














           11 .   Remove the inlet pipe joint.

                                                      (a)    Screw out the fixing bolts of the inlet pipe joint,
                                                             and take down the inlet pipe joint.

















                                                      (b)    Remove the gasket ring from the inlet pipe
                                                             joint.


















                                                      12 .   Screw out the fixing bolts and the bolts
                                                             module, and take out the inlet heater.























                                                                                                        Page 1288
   1283   1284   1285   1286   1287   1288   1289   1290   1291   1292   1293