Hydraulic Services

                   •  Disconnection and reconnection of existing kitchen services to suit the new kitchen/breakout
                       layout

               Window Furnishings

                   •  Modifications and additions to the existing roller blinds to suit the new office layout around the
                       perimeter of the building
               Cleaning

                   •  Progressive cleaning and rubbish removal throughout the project
                   •  Final cleaning on completion of the project

               POST HANDOVER

                   •  Arrange Private Certifier inspection and signoff
                   •  Submit Application for Certificate of Occupancy and Use
                   •  Prepare as-installed drawings
                   •  Management of defects list and defects close out



                           LUMP SUM QUOTATION                                $197,828.00

                           GST                                               $  19,782.80

                           TOTAL QUOTATION PRICE                             $217,610.80



               TENDER CLARIFICATIONS

               ▪  Our tender is valid for a period of 90 days from the date of this letter.
               ▪  We have allowed for all works to take place within normal working hours, however noisy and
                   disruptive works will be performed outside normal working hours.
               ▪  We have not allowed for the relocation of staff, office equipment or personal equipment in our
                   quotation.
               ▪  We have not allowed for IT setup, computer setup or server rack patching in our quotation and have
                   assumed that this will be performed by a Leidos IT maintenance provider.

               ▪  We have not allowed for new meeting room and kitchen/breakout chairs and tables.
               ▪  We have not allowed for signage in our quotation.

               ▪  We have not allowed for office joinery, credenzas, planter boxes or storage units in our quotation.
               ▪  We have not allowed for acoustic engineering or security engineering in our quotation, inclusive of
                   SCEC consultants.
               ▪  We have allowed of standard laminate and fabric finishes in our quotation.
               ▪  We have not allowed for new supplementary airconditioning units in our quotation.