Page 10 - Boss Projects Group Submission - Leidos Mezzanine Refit
P. 10

DESIGN OPTIONS


               We have reviewed the statement of works and have allowed to deliver the project as per the below
               design layouts. We believe the below option makes best use of the space on the Mezzanine.


               Demolition Layout:




































































                                                                                                  10 | P a g e
   5   6   7   8   9   10   11   12   13   14   15