Page 13 - Intro booklet 2021_Neat
P. 13

•  Level Four: I have a special request that does not fit the other categories.


                       A level four assignment is ordered when the carrier or assigning party has a request
                       that doesn’t fit one of the other categories. A level four assignment might include

                       reviewing another vendor’s assessment or estimate, consulting with legal cases,
                       assisting with issue resolution, or providing training for their staff.


                   •  HARP

                       HARP stands for Housing Assessment and Relocation Program. A HARP assignment

                       is given when the assigning party is needing assistance with locating accessible
                       housing, either temporary or permanent, new or existing, or when the parameters
                       of the housing issues require the carrier to consider non-traditional options.


               File Set Up

               Upon receiving an assignment, the DCC intake person transfers the information from the

               assignment form to “GClaim”, an on-line file management system. The intake person also
               reviews the assignment:


                   1.  To determine that the assignment level is appropriate for the requested activity
                   2.  To determine that all necessary documents are accompanying the assignment
                       form

                   3.  To ensure the right DCC personnel are notified of the assignment

               The assigning party should receive a confirmation of receipt of assignment within 24
               hours of the assignment.


               Three Phase Home Modification Process


                   •  Phase One (Assessment / Scope Development)


                       The first phase is designed to establish an appropriate and accurate scope of work.
                       Phase one begins with the assignment of the file and it ends when an “agreed
                       scope” of work is established.