Page 33 - KRCL ENglish
P. 33

9.2  Rolling Stock Component Factory, Ratnagiri

                         The Rolling Stock Component Factory is being built by KRCL as a modern, platinum
                         rated Green and energy efcient Factory for Central Railway to overhaul rolling stock
                         bogies, assemblies and components. It is being constructed at Additional Parshuram
                         Lote  on  50  acre  land.  The  turnkey  contract  for  construction  of  the  Rolling  Stock
                         Component Factory was awarded to M/s Tata Projects Ltd on 12.7.2019. The work
                         amounting to `77.84 crore against was completed during 2019-20.





















                             Photo: The schematic view and the foundation work at factory site

                   9.3  Asset Reliability and Safety Performance

                         The asset reliability and safety performance has been maintained during the year with
                         Zero Accidents/Derailments on Rolling Stock Account; Zero SPAD cases; Zero Coach
                         Detachment and Zero Wagon detachment on KRCL account and Zero Hot Axle Cases.

                   9.4  Development of Track Machines Maintenance System (TMMS)

                         In order to improve performance of Track Machines and to automate and digitize the
                         operation & maintenance, Mechanical department has designed and developed a web-
                         based Track Machines Management System (TMMS) for all Track Machines for the rst
                         time in Indian Railways. This system has various features such as GPS based tracking of
                         machines,  paperless  working  by  feeding  all  data  and  information  directly  on  the
                         application  provided  in  the  tablets,  computerized  productivity  and  reliability
                         performance analysis and inventory planning.

                   9.5  Automated Train Examination System (ATES)


                         KRCL  received  an  order  for  installation  of  03  ATES  systems  in  Mughalsarai-Kanpur
                         section of North Central Railway which is major trunk route of Indian Railways with speed
                         over 120 KMPH. Earlier Two ATES sets were commissioned at Nagpur in Central Railway.



                                                             31
   28   29   30   31   32   33   34   35   36   37   38