Page 35 - KRCL ENglish
P. 35

10. SIGNAL AND TELECOMMUNICATION

                   10.1  Replaced over aged relay based Panel Interlocking with Electronic Interlocking at Udupi
                         and Mulki stations, thereby enhancing safety in train operations with improved reliability.
                         Remodeling in yard is easy and less time consuming. These stations are also made
                         Railway Electrication complaint.














                                  At UDUPI                                       At MULKI
                   10.2  Provided additional loop lines at Anjani, Adavali, Vaibhavwadi & Murudeshwar stations,

                         facilitating improvement in operational capacity.












                                                                                                                                    At ADAVALI
                                  At ANJANI












                           At VAIBHAVWADI ROAD                                                At MURUDESHWAR

                   10.3  Commissioned Thokur – Bijoor, 108 km section for 25 KV Railway Electrication, after
                         CRS inspection on 12.03.2020, involving alterations in existing PI Signaling circuits,
                         installation  &  commissioning  of  outdoor  Signaling  equipment  suitable  for  Railway
                         Electrication at 08 Stations (Thokur, Surathkal, Nandikur, Padubidri, Barkur, Kundapur,
                         Senapur & Bijoor).





                                                             33
   30   31   32   33   34   35   36   37   38   39   40