Page 35 - KRCL ENglish
P. 35
10. SIGNAL AND TELECOMMUNICATION
10.1 Replaced over aged relay based Panel Interlocking with Electronic Interlocking at Udupi
and Mulki stations, thereby enhancing safety in train operations with improved reliability.
Remodeling in yard is easy and less time consuming. These stations are also made
Railway Electrication complaint.
At UDUPI At MULKI
10.2 Provided additional loop lines at Anjani, Adavali, Vaibhavwadi & Murudeshwar stations,
facilitating improvement in operational capacity.
At ADAVALI
At ANJANI
At VAIBHAVWADI ROAD At MURUDESHWAR
10.3 Commissioned Thokur – Bijoor, 108 km section for 25 KV Railway Electrication, after
CRS inspection on 12.03.2020, involving alterations in existing PI Signaling circuits,
installation & commissioning of outdoor Signaling equipment suitable for Railway
Electrication at 08 Stations (Thokur, Surathkal, Nandikur, Padubidri, Barkur, Kundapur,
Senapur & Bijoor).
33