GENERAL ELECTRICAL SPECIFICATION
Version 2014-2
The Electrical Contractor is to be responsible for the correct ordering, taking delivery,
storage, protection and safe custody of all goods, plant and materials necessary for the
correct execution of the work.
This is to include all items incorporated within the installation, including any
plant/equipment or Client equipment and any supplied by Contractor's Sub-Contractors.
The Electrical Contractor is to include all costs associated with these requirements.
The Electrical Contractor is to protect, uphold and maintain all pipes, ducts, sewers,
service mains, overhead cables etc., belonging to the Client, the Private or Public Utility
Companies affected by the project during the execution of the Works. The Electrical
Contractor is to make good any damage due to any cause within his control at his own
expense and pay any costs and charges in connection therewith.
1.2.10 Co-Ordination
The Electrical Contractor is to ensure that full liaison with all Contractors’ engaged on the
Contract takes place, to ensure satisfactory design progress and installation of the Works.
The Electrical Contractor is to co-ordinate his design with other trades to facilitate
installations. Where a number of installations share a common route the installations
shall generally proceed in the following order:
1. Drainage and waste plumbing
2. AC / Ventilation ductwork
3. Sprinkler Pipework
4. Service pipework
5. Electrical work
Where mechanical or electrical equipment is specified by manufacturer's name and
catalogue number it indicates the type and standard of equipment required. The Electrical
Contractor is to ensure that the equipment supplied is co-ordinated with other services
and building works, and is suitable to comply with the design performance requirements
and all standards, guides, and regulations.
1.2.11 Dimensions
The Electrical Contractor is to take his own dimensions of the buildings or structures for
the purpose of installing the plant and equipment and is to be responsible for the
accuracy of such dimensions.
Reference is to be made to latest Architectural and Structural information.
1.2.12 Definition of Drawings
The following definitions are to be applied to drawings referred to and/or required by this
specification: