GENERAL ELECTRICAL SPECIFICATION
                                 Version 2014-2



               1.2.13  Contractor’s Obligations


                         The general MEP preambles detailed herein are to be read as supplementary to the main
                         Contract Conditions. Where conflict arises, the  Electrical Contractor is to bring to the
                         attention of the PM for clarification prior to the submission of his Tender.
                         The Electrical Contractor is to take due notice of his obligations in this regard and make
                         allowance within his tender for compliance thereto.

                         The Electrical Contractor is not to use the site for any purpose other than the Contract
                         Works.

                         The  Electrical Contractor is to allow for providing the following information following
                         acceptance of his tender:
                           1.  Detailed programme for design and installation.
                           2.  Detailed labour resource histogram and regular updates throughout the course of
                               the Contract Works.
                           3.  Monthly progress reports and attendance at site meetings.
                           4.  All builderswork’s information, drawings and schedules required in connection with
                               the Contract Works.

                         The  Electrical Contractor  is to allow for complying with all other conditions and
                         restrictions as detailed within the Contractor's preliminaries, with particular regard, but
                         without limitation, to maintenance of services, site cleanliness, maintenance of access
                         routes, and removal of rubbish.

                         The  Electrical Contractor is to allow for liaison with other Contractors, and artists,
                         tradesmen and Statutory Authorities.

               1.2.14  Special Tools and Accessories

                         Special tools and accessories required for the proper running and maintenance of the
                         plant are to be supplied by the Electrical Contractor and handed to the Client.

                         The  Electrical Contractor  shall be responsible for obtaining a signed receipt for all
                         equipment passed to the Client.

               1.2.15  Practical Completion

                         The installations are to only be considered complete when the installations are officially
                         approved and accepted by the PM.

                         The installation shall not be deemed complete until:

                           1.  All testing and commissioning as prescribed elsewhere is  complete to the
                               satisfaction of the PM and record of tests has been provided by the  Electrical
                               Contractor. These are to form part of the maintenance manual to be supplied.
                           2.  Spares, tools, equipment etc have been passed to the Client.