GENERAL ELECTRICAL SPECIFICATION
Version 2014-2
1.2.26 Training of Client’s Staff
The Electrical Contractor is to allow for the provision of sufficient skilled personnel, during
ordinary working hours for the purpose of instructing the Client's staff in the operation of
the plant.
The Contractor is to include for all costs in connection with specialist training for the
Client's staff on operation and maintenance of particular plant or systems (Refer to the
Particular Specification for any additional specific requirements).
The Project Manager may at his discretion redistribute days allocated between individual
systems to suit the store managers requirements.
1.2.27 Document and Drawings on Site
The Electrical Contractor is to ensure that one copy of the current Design/Installation
Documents prepared by the Electrical Contractor are kept in his office on site at all times
and that his staff and operatives are fully conversant with same.
The Electrical Contractor is to also include for keeping one set of his installation drawings
in his office on site upon which he is to keep marked up, on a daily basis the installation
progress to record the progress of the Contract Works. These drawings are to be kept
solely for this purpose and are to be kept up to date at all times together with any
amendments or variations to the works which are to be recorded upon them.
The "marked up" set of installation drawings are to form the basis of the "Record
Drawings" required upon completion of the Contract Works as described elsewhere on
this document.
1.2.28 Setting Out the Contract Works
In setting out the Contract Works it shall be the Electrical Contractors responsibility to
satisfy himself that any dimensions, sizes and levels provided to him are correct and
should he wish to query any of these he is to give written notice to the Project Manager
before putting work in hand.
The Electrical Contractor is to be responsible for all dimensions descriptions and
annotations provided by him on his design, installation and builders work drawings and is
to be responsible for setting out the Contract Works during installation and for the
correctness of the positions, levels and dimensions of the Contract Works. The Electrical
Contractor is to supervise and be responsible for the accuracy of all other information
provided.
If at any time during the progress of the Works any error appears or arises in the
positions, levels or dimensions of the Contract Works, the Contractor is to at his own
expense remove and amend the Contract Work to the satisfaction of the Project