GENERAL ELECTRICAL SPECIFICATION
                                 Version 2014-2



                         commissioned/ balanced to his satisfaction.   Records of commissioning are to be
                         forwarded to the Project Manager prior to the witnessing.

                         Commissioning and test results are to be prepared in a tabular form on a format to be
                         previously submitted to and agreed by the Project Manager.

                         Following agreement and approval to the commissioning and test results they are to form
                         part of the "Operating and Maintenance Manuals".
               1.2.22  Design and Performance Responsibility


                         The Electrical Contractor is to be responsible for works including but not limited to:
                           1.  The provision of builders works information and drawings.
                           2.  The design, drawing and fabrication of brackets, supports and associated fixings.
                           3.  The provision of design, installation, working and fabrication drawings, including
                               the co-ordination of detailed installation elements within the building fabric.
                           4.  The selection and suitability of all items specified by performance.
                           5.  The design of the fire alarm installation shall lie with the specialist contractor
                               through the Electrical Contractor.
                           6.  The BMS design and installation to meet the design intent of the BMS performance
                               specification

               1.2.23  Materials and Equipment


                         The Contractor is to be totally responsible for ensuring that all nominated firms supplying
                         equipment or carrying out work, comply with these Employers Requirements.
                         Where items are specified by name and/or model number, it is the Electrical Contractor's
                         responsibility to ensure that the item specified and supplied meets the performance
                         criteria given.

                         All materials are to be in accordance with the types and manufacture described in this
                         Specification. Where the Electrical Contractor  desires to use materials differing from
                         those described, alternatives may be offered wherever he considers this desirable.  Any
                         alternatives offered must be approved in writing by PM.

                         The Project Manager reserves the right to inspect materials on site and to reject any
                         materials not complying with this Specification.

                         The cost of any dismantling and re-erection of the installation occasioned by the removal
                         of rejected materials are to be borne by the Electrical Contractor.
                         The Electrical Contractor is to ensure that delivery, assembly, erection, testing, setting to
                         work and completion by a nominated firm including any variations affecting that firm,
                         complies with the requirements of this Specification.

                         The cost to the Electrical Contractor of ensuring the above procedures are carried out is to
                         be borne entirely by the Electrical Contractor.