Page 64 - RotF - Electrical Specification_Neat
P. 64

GENERAL ELECTRICAL SPECIFICATION
                                 Version 2014-2



                         The bus bar trunking shall have three phase conductor and one neutral conductor. Each
                         phase conductor shall serve a separate circuit as below: -

                         Circuit 1 (L1)    50% of lighting
                         Circuit 2 (L2)    50% of lighting plus wall lights
                         Circuit 3 (L3)    Emergency lighting
                         The neutral shall be common to all circuits.


                         The trunking shall be fixed at 3 metre centres, mounted on its edge using purpose made
                         fixing brackets. The trunking shall be fixed to the underside of the main steels or, to the
                         roof purlins using M6 galvanised steel threaded rod, as detailed on the drawings.

                         Each section of trunking shall be connected using the plug-in jointing device provided.
                         Whole lengths of trunking only shall be utilised i.e. cutting of the trunking will not be
                         required.
                         Each run of trunking shall be fed via an end feed unit, which is supplied complete with an
                         end cover, this shall be fitted to the opposite end of the trunking run. Each end feed unit
                         shall be connected to the fixed wiring system as detailed.

                                                                                 2
                         Final connections to each feed unit shall be made using 6mm  5 core YY flexible cable to
                         VDE specification.

               2.10  INTERIOR LIGHTING

               2.10.1  Luminaires


                         All luminaires will be free issue, called off by the Electrical Contractor from McDonalds
                         specialist supplier as detailed below: -
                         LAUK Group Ltd
                         Emerald Way
                         Stone Business Park
                         Stone
                         Staffs
                         ST15 0SR

                         Contact: Bruce Robinson/Oliver Freer
                         Telephone: 01785 272070
                         E-mail: bruce.robinson@laukgroup.com; oliver.freer@laukgroup.com

                         Luminaires for public spaces and over the counter shall be as specified on the Architects
                         drawings and shall be installed by the Electrical Contractor in the positions indicated on
                         the Architects drawings.




                                                      McDonalds Restaurants Ltd

                                                                42
   59   60   61   62   63   64   65   66   67   68   69