Drainage & Piped Services Standard Specification
Version 2014-1

1.2.7 Builderswork

             All bases, holes through structures, positions for brackets, chases etc, are to be detailed
             by the Contractor either on drawings submitted in accordance with dates or agreed by
             marking out on site in advance. The Contractor is to be fully responsible for the correct
             positioning.

             Where the formation of holes, cutting away etc, might adversely affect the building
             structure, drawings detailing those requirements are to be prepared by the Contractor
             and submitted to the Project Manager (PM) for approval.

             The Contractor is to provide all necessary fixing devices. Where brackets require to be
             built into the structure, sufficient detailed drawings or templates for all items requiring
             foundation bolts or other fixtures and for all plant required to be built into, or
             otherwise affecting the structure are to be provided for comment by the design team.

             The Contractor is to ensure that the foundation levels for plant, bedding or grouting in
             of plant on foundations and bases, and grouting in of other fixings are adequately and
             properly performed.

             The Contractor shall arrange for the construction of all builders work ducts, excavation,
             back filling and reinstatement of all trenches, including the installation of service
             marker posts. The Contractor is to detail the routes of these services on dimensioned
             drawings submitted to the PM for approval. These drawings are to form part of the
             project CDM file and are to be made available immediately after the service has been
             laid. The drawings are to ultimately be incorporated in the O & M Manuals.

             The Contractor is to make allowance for the supply and installation of fire stopping of
             all trunking, trays, pipework, ductwork and for all equipment and services passing
             through fire compartments.

1.2.8 Site Meetings and Reports

             The Contractor is to have a representative in attendance when required at any site
             meetings. The M & E Coordinator is to be fully conversant and familiar with the scope
             and details of the Contract, the Contract programme, labour resources etc., and be
             authorised to take any action and make any decision necessary. The Contractor is to
             allow at least one day a week for this purpose.

1.2.9 Protection and Handling

             All works, both during and after installation, until the completed project is handed over
             to the Client, are to be suitably and adequately protected against damage by other
             trades or by water or frost. Such protection is to be dismantled and removed from site
             immediately prior to handover.

             The Contractor is to be responsible for the correct ordering, taking delivery, storage,
             protection and safe custody of all goods, plant and materials necessary for the correct
             execution of the work.

             This is to include all items incorporated within the installation, including any
             plant/equipment or Client equipment and any supplied by Contractor's Sub-
             Contractors.

             The Contractor is to include all costs associated with these requirements.