             between centres and are to be approximately 11.0mm from the edge of the sheet to
             the centre of the holes.

             The name of the manual is to be shown on the front and spine of the cover. Where the
             handbook is comprised of more than one book or volume each book or volume is to be
             numbered. The book or volume number is to be shown on the front and spine of the
             cover.

             In addition to the above the contractor is to provide a building logbook in accordance
             to the requirements of the Part L of the building regulations based on the format of
             CIBSE TM31 guidance and template.

1.2.13 Contractor’s Obligations

             The general MEP preambles detailed herein are to be read as supplementary to the
             main Contract Conditions. Where conflict arises, the Contractor is to bring to the
             attention of the PM for clarification prior to the submission of his Tender.

             The Contractor is to take due notice of his obligations in this regard and make
             allowance within his tender for compliance thereto.

             The Contractor is not to use the site for any purpose other than the Contract Works.

             The Contractor is to allow for providing the following information following acceptance
             of his tender:

                1. Detailed programme for design and installation.
                2. Detailed labour resource histogram and regular updates throughout the course

                     of the Contract Works.
                3. Monthly progress reports and attendance at site meetings.
                4. All builderswork’s information, drawings and schedules required in connection

                     with the Contract Works.

             The Contractor is to allow for complying with all other conditions and restrictions as
             detailed within the Contractor's preliminaries, with particular regard, but without
             limitation, to maintenance of services, site cleanliness, maintenance of access routes,
             and removal of rubbish.

             The Contractor is to allow for liaison with other Contractors, and artists, tradesmen and
             Statutory Authorities.

1.2.14 Special Tools and Accessories

             Special tools and accessories required for the proper running and maintenance of the
             plant are to be supplied by the Contractor and handed to the Client.

             The Contractor shall be responsible for obtaining a signed receipt for all equipment
             passed to the Client.

1.2.15 Practical Completion

             The installations are to only be considered complete when the installations are officially
             approved and accepted by the PM.

             The installation shall not be deemed complete until: