 Change to finishing blades or continue with the combined trowel blades to finish
    the surface, sealing the porous material.

 Run the power trowel at its top speed with the blades fully pitched downward
    onto the concrete. This will give the highest pressure on the slab.

 Make as many passes at right angles as desired to get a matte, light gloss or
    gleaming finish. (Refer to the Diagrams below to achieve a desirable finishing.)

First Pass Diagram:

Second Pass Diagram