Page 1113 - Workshop Manual - Aumark (BJ1051)
P. 1113
51-21
Heater and air conditioner-air duct of instrument panel
9. Install hot air water pipe 1 and hot air water pipe 2
(a). Screw down the 2 hose hoops and install hot air water pipe 1 and hot air water pipe 2.
(b). Install the hot air pipe clip.
51
(c). Install the front mask assembly. (Refer to
“chapter 77 internal/external trimming
parts front mask assembly-replacement”)
10. Add coolant liquid
(a). Screw down the water drain valve.
(b). Add coolant liquid (Refer to the service
manual with isf of cummins engine)
Page 1113

