Page 1113 - Workshop Manual - Aumark (BJ1051)
P. 1113

51-21
                                          Heater and air conditioner-air duct of instrument panel

               9.     Install hot air water pipe 1 and hot air water pipe 2
               (a).    Screw down the 2 hose hoops and install hot air water pipe 1 and hot air water pipe 2.


































                                                                (b).   Install the hot air pipe clip.



                                                                                                                    51









                                                                (c).   Install the front mask assembly. (Refer to
                                                                       “chapter 77 internal/external trimming
                                                                       parts front mask assembly-replacement”)

                                                                10.    Add coolant liquid
                                                                (a).   Screw down the water drain valve.













                                                                (b).   Add coolant liquid  (Refer to the  service
                                                                       manual with isf of cummins engine)







                                                                                                        Page 1113
   1108   1109   1110   1111   1112   1113   1114   1115   1116   1117   1118