Page 1135 - Workshop Manual - Aumark (BJ1051)
P. 1135

51-43
                                                      Heater and AC-AC Pipe


               Inspection

               1.     Full the pipeline with dry nitrogen; high pressure pipe uses 3.5MPa pressure and low
                      pressure pipe uses 1.67MPa pressure; immerse the pipe into water 5 minutes and
                      observe if there is air bubble on its surface.







































                                                                                                                    51








































                                                                                                        Page 1135
   1130   1131   1132   1133   1134   1135   1136   1137   1138   1139   1140