Page 924 - Workshop Manual - Aumark (BJ1051)
P. 924
31B-4
Transmission 6g120 -transmission control mechanism
8. Connect the control flexible axle and the
control handle assy
(a). Screw up the connecting bolts of the gear
selecting flexible axle and the gear selecting
arm, connect the gear selecting flexible axle and
the gear selecting arm.
(b). Insert into the cotter pin of gearshift arm,
connect the gearshift flexible axle and the
gearshift arm.
9. Install the control rod shield sleeve
(a). Set on the gear shift level shield sleeve.
10. Install the control handle ball head
(a). Screw up the control handle ball head
clockwise.
Hint:
Apply appropriate amount of anaerobic adhesive
(Loctite 495) during the assembly of control handle ball
head and the control rod.
31B
Page 924

