11. Post-closure care should be 15 years with monitoring of leachate (to be treated or
                         sent to a sewage treatment plant [STP]), gas generation, and groundwater quality
                         (in monitoring wells).

                      These components are described in detail in the following subsections.

                      4.1.1 COMPONENTS AND INTERVENTIONS OF SCIENTIFIC CLOSURE

                      The final cover layer is to be applied to the entire dumpsite surface after confining
                      the dumpsite into smaller footprint area and grading into the designed slope. The
                      final  cover  usually  consists  of  multiple  layers  designed  to  enhance  surface
                      drainage,  intercept  percolating  water  and  support  surface  vegetation.  The  final
                      cover shall have a barrier soil layer comprising of 60cm clay or blended soil with
                                                             -7
                      permeability coefficient less than 1 x 10  cm/sec. The barrier soil layer is capped
                      by  a  drainage  layer  of  15cm.  The  drainage  layer  shall  then  be  capped  by  a
                      vegetative layer of 45cm to support natural plant growth and to minimize erosion.

                      A  grain  size  analysis  for  every  400  cu.m  of  material  used  is  recommended  for
                      quality control purposes. The layer shall be compacted to above 95% density to
                      provide a firm sub base for the low – permeability layer above. The density shall be
                      tested at 30 m grid points.

                      Laying  of  the  topsoil  layer  shall  be  done  as  soon  as  the  protective  layer
                      construction is finished. Heavy construction equipment shall not be allowed on the
                      finished  surface.  The  nutrient  and  liming  requirements  for  the  topsoil  shall  be
                      assessed from a competent agricultural laboratory. In the absence of a regulatory
                      recommendation/ requirement regarding seed mix, a horticulturist or soil scientist
                      shall be consulted. A combination of grass and bush type vegetation capable of
                      surviving without irrigation water shall be planted. At least five samples of topsoil
                      per hectare shall be tested for nutrient and liming requirements. Nutrient and seed
                      mix application rates shall be supervised on site for quality control purpose. Utmost
                      care shall be exercised in installation of the gas vents in the final cover where ever
                      to be provided.

                      The  final  cover  shall  have  a  gradient  of  3  to  5%  to  assist  surface  runoff.  Lined
                      ditches  or  channels  are  constructed  on  the  final  cover  to  intercept  and  carry
                      surface water off the cover to the storm water basin.


                         4.1.2  LANDFILL CLOSURE
                      For the closure of open dumpsite, the following interconnectivities are established:

                       -   The  surface  water  drainage  system  for  the  cover  of  each  phase  is  to  be
                          connected (if so designed)
                       -   The gas collection system (if provided) of each phase is to be connected.
                       -   An  access  road  is  provided  on  the  landfill  cover  to  enable  easy  approach  for
                          routine inspection & maintenance of landfill cover.

                         4.1.3  POST CLOSURE STABILIZATION, OPERATION AND CARE


                         4.1.4  LONG –TERM VEGETATIVE STABILIZATION