CHAPTER – V


                5.0 DETAILS OF PROPOSED TECHNOLOGY

                      This chapter provides the step wise details of all the aspects involved in the proposed
                      technology. Various aspects of biomining technology are:-
                         1.  Stages of Biomining

                         2.  Costing

                         3.  Project Timeline
                         4.  Safety

               5.1 STAGES OF BIOMINING

                      The  biomining  activities  involves  various  stages  from  initial  surveys  and  site
                      investigations,  planning,  site  development,  processing  of  legacy  waste,  end  use
                      planning of recovered material, disposal of rejects in appropriate methods etc. These
                      activities are discussed in detail in following subsections.
                      The RNN shall earmark the land extending to a minimum of two acres with natural
                      ground level for setting up the processing plant to the Developer/Contractor on their
                      furnishing security deposit and execution of the Contract Agreement.


                 5.1.1 SURVEY AND VOLUME DECISION
                      An  initial  Contour  Survey  will  be  conducted  for  the  whole  site  by  the  contractor
                      before  he  starts  the  Bio-mining  process  to  ascertain  the  total  volume  of  waste
                      dumped. This report will be duly submitted to the RNN as the reference quantity
                      and acknowledged. The degraded and compacted solid waste has to be excavated
                      shall be earmarked at this stage.

                      At predefined volume of legacy waste processed the contour survey will be carried
                      out  to  ascertain the  decrease  in  the  volume  and  keep record  of  progress  in  the
                      work.

                 5.1.2 WORK PLAN
                      The  work  plan  for  various  activities  and  time  schedule  should  be  prepared  and
                      RNN should appoint personnel for the monitoring of these project activities.

                      The  open  drain  coming  into  the  dumpsite  should  be  diverted  to  avoid  the  water
                      logging conditions in the site during the operational phase. The operation should
                      be planned for non-rainy season to avoid the discontinuation in the work.


                 5.1.3   DEVELOPMENT OF PROJECT SITE
                      The processing machineries shall set up according to the required capacity and the
                      predefined timeframe. The additional required infrastructure should developed by
                      contactor like fencing to the site and adequate lighting system for proper working
                      conditions  at  site.  Adequate  power  back-up  shall  be  ensured  by  the