LEARNINGS FROM WORKING DRAWING


           1. SETTING OUT PLAN & SITE PLAN
                  • Should follow triangulation method taking reference from nearest
                     corner of site to the center point of column and similarly c/c to others.
                  • Setting out plan is for determination of actual column placement in
                     site whereas site plan is for the determination of building footprint.
           2. LAYOUT AND CONSTRUCTION PLAN OF ALL FLOORS
                  •  Layout plan- dimension is turned off.
                  • Construction plan: furniture layer is turned off and different reference
                     notation are given which make easier to find out section, elevation
                     ,wall section.






                                                       3. SECTIONS AND ELEVATION
                                                              • Different levels are mentioned in
                                                                 section.
                                                              • Elevation drafting with proper glass
                                                                 hatch and line weight with doors
                                                                 window dimension and wall section is
                                                                 to be denoted in elevation.
                       Notation for
                       wall section                    4. FLOOR FINISH
                                                              • Proper notation , hatch and legends
                                                                 with flooring type
                                                              • Sectional detail should be provided
                                                                 where there is variation in flooring in
                                                                 same level.
                                                              • Gain knowledge of different type of
                                                                 flooring    material      their    laying
                                                                 methodology etc.







   5. DOOR WINDOW SCHEDULE
          • Learned       to     design      different
             types(sliding ,fixed ,corner ,cascade)
             of windows and door(pivoted, hollow
             core, decorative panels) according to
             the function of room.
          • normal window =clear glass of 2-
             4mm thk.
          • If Window height exceed 6 ft then
             toughened glass of 8-12 mm thick is
             used.
          • Usual height of door =2400mm
          • Learned to schedule with notation