Control of Industrial Major Accident Hazards (CIMAH) Report   Page       45
                                               Ranhill SAJ Sdn. Bhd.                    Revision      01
                            Part C: Information Relating to the Safety Management System  Date      Aug 2019


                   •  Needs to accommodate changes in the business or facility due to legislation
                       and other external factors; and
                   •  OSH objectives and plan for the following year.

               The data required  for an effective OSH MS management review shall be collated
               and at a minimum should include:
                   •  Follow-up actions from previous management reviews;
                   •  Review of OSH policies;
                   •  Review of OSH performance including achievement of OSH objectives;
                   •  Review of incident statistics or reports;

                   •  Review of anticipated changes in OSH legislation;
                   •  Results of audits;
                   •  Supplier/contractor performance;
                   •  Proposed improvements to the OSH management system;
                   •  Actual or  anticipated changes to the organisational structure and
                       responsibilities;
                   •  Results of  communication and consultation with internal and external
                       interested parties;
                   •  Interested  party feedback/complaint, including but not limited  to  personnel,
                       contractors, clients, community and regulatory authorities;
                   •  Status of corrective, preventive and improvement actions;
                   •  Changing circumstances, including developments in legal and other
                       requirements; and
                   •  Results of the evaluation of compliance with legal and other requirements.

               The output from the management review will be:

                   •  Recommendations for  continuous  improvement of the management system;
                       and
                   •  Resources  needed to enable continuous improvement  to the  management
                       system and its processes.

               C.2.15 Records & Document Management Control

               This includes an arrangement for control of process safety information such
               as P&ID, technical drawings, equipment specification or datasheet, risk
               assessment reports, etc to  ensure they  are up-to-date, available and
               accessible.     Description      on    the   development,       review,    update     and
               communication processes should be included. Detailed list of the procedures
               or instructions can be included in the attachment if necessary