Page 44 - Bernardon Dover Master Plan Booklet
P. 44
AREAS OF OPPORTUNITY
OPPORTUNITY
ANALYSIS
Land & Building Parcels Studied
C E C I L S T During the initial design phase for the Downtown
Dover Redevelopment plan, three main parcels
F U L T O N S T E D I V I S I O N S T owned by DDP (highlighted in orange) were given
as sites that could be immediately designed and
developed. As the design phase progressed, several
other parcels were added into the master plan
12 (highlighted in pink). The parcels consist of sites
W D I V I S I O N S T P A R K D R existing city owned buildings, and vacant lots.
that contain existing privately owned buildings,
K I N G S H W Y S W 11 E L O O C K E R M A N S T
W R E E D S T
S S T A T E S T A L L E Y
S S T A T E S T
10
5 S G O V E R N O R S A V E 8 S B R A D F O R D S T L O O C K E R M A N P L A Z A
9
F O R E S T S T
6
W L O O C K E R M A N S T
S N E W S T
S Q U E E N S T
K I R K W O O D S T
2 3 7
1 R A I L R O A D A V E 4
W N O R T H S T
KEY:
DDP OWNED PARCELS B A N K L N
ADDITIONAL DESIGN AREAS
DOWNTOWN DSU IMPROVEMENTS
1 RAILROAD AVENUE (DDP OWNED)
2 RAILROAD AVENUE (ACQUIRED PARCELS) W W A T E R S T
3 600 FOREST STREET (PARKLET)
4 326 W. LOOCKERMAN STREET
5 120 S. GOVERNORS AVENUE (DDP OWNED)
6 239 W. LOOCKERMAN STREET
7 LOOCKERMAN WAY PLAZA
8 129 GOVERNORS AVENUE (PARKING STRUCTCURE)
9 LOOCKERMAN EXCHANGE
10 CITY HALL
200 600
11 POST OFFICE 100 400 1000
12 MEMORIAL PARK (DDP OWNED)
Image Credit:
Figure X.X Opportunity Analysis Image Credit: Google Maps
e Maps
Googl
43 CAPITAL CITY 2030: TRANSFORMING DOWNTOWN DOVER | Master Plan for Downtown Dover | Dover, DE | Downtown Dover Partnership