STEEL
This is where the pool starts taking shape; the skeleton of the pool
should be 3’’ off dirt to strengthen the structure of the pool. The steel
crew will follow the correct engineering plan as stipulated by the
engineers. Plumbing for the spa therapies may not be finished until
steel is complete. All pools will have “surcharged” steel included,
meaning there will be extra steel added in the walls.
If you have a table or barstools in your pool they will leave a “metal tree”
behind which will be used to build the table
ESTIMATED PHASE TIME: 1 DAY