Page 17 - SideWinder®
P. 17

®
                    SideWinder


                    Installation

                    Tunnel Placement Overview

                       Staggered with a set of Quick Fire® Plus assemblies
                                                                  204”


























                    219”
                                                                                                           135”
                                                              143”








                         63”





                                                                  DIRECTION
                                                                      of
                                                                   TRAVEL

                                                                Operating Envelope


                                           64”
                                                                 174”

                                     174" dimension is taken from the outer edge of the base plate on each of the SideWinder®
                              64" dimension is taken from the outer edge of the driver side base plate to inside edge of the conveyor guide rail
                                                 Heavy dotted lines show proper operating envelope.


                           Note:  The above image is shown with cleaning material installed to indicate the operating envelope
                                  required for proper function



                       1MANUL955       Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681      15
   12   13   14   15   16   17   18   19   20   21   22