Page 101 - Saber® Installation & Startup
P. 101

INSTALLATION & STARTUP

                      Chapter 6 Frame and Carriage Assembly



                      Connecting the Boom

                          Overview of Typical Boom Orientation








                                         Expansion Rail

                                                                                        Threaded rods

                                           Direction
                                           of Travel




                                                                        Swing the boom
                                             To center of
                                                    16-1/4”             out to the Wall
                                             Boom Bearing
                                                                        Mount Assembly
                                               151”
                              Equipment                                 Four pieces at 3” x 3”
                              Room        Wall Manifold   Threaded Rod (typical)   make up the Backer
                                                                        Plate


                                                                  Overhead view
                                 Above image is shown with the boom assembly oriented towards the passenger side and the Wall Manifold has the “Thru-Wall” option.
                                                     Actual configuration is determined per site specifications



































                       1MANUL290       Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681   6-39
   96   97   98   99   100   101   102   103   104   105   106