Page 2037 - Foton Workshop Manual - Tunland (AT)
P. 2037
HEATER AND AIR CONDITIONING - A/C PIPE 61-41
(b) Tighten the retaining bolts of the high
pressure pipe.
Torque: 8 ~ 9 N·m
61
(c) Install the pipe between the expansion valve
and the compressor.
(d) Tighten the pipe retaining bolts connected to
the compressor.
Torque: 21 ~ 25N•m
(e) Tighten the pipe retaining bolts.
Torque: 8 ~ 9 N·m
Page 2037