Recommendations

           1.  Passing valve at DHDS B/L to be replaced in the earliest opportunity. Also, provision of double valve may
              be looked into.
            2.  All other passing valves to be replaced.

            3.  Presence of pyrophoric iron and its mitigation measure to be included in the hazards while doing this
              activity as the flange is located closer to the Chloride guard.
            4.  Continuous Nitrogen purging shall be ensured, in case job is being carried out on Passing valves of
              H/C, or combustible gas.
            5.  Ensure critical jobs pertaining to Hydrogen services shall be analysed with JSA.




             Case 27                              Date: 22.05.2020                      Time: 11:29 hrs.


             Incident


            Smouldering (smoke) was observed in oil soaked insulation of MP steam header, in pipe trench along the
            Street 15 & junction of Road-C. Smouldering was doused immediately by application of water spray.







































             Root Cause

            External corrosion of the line due to low ground clearance was suspected to be the cause of the leak.