GENERAL ELECTRICAL SPECIFICATION
                                 Version 2014-2



                         Goods are to be ordered with protective packaging where applicable and these are to be
                         maintained in their position as long as possible.

                         The  Electrical Contractor  is to provide full protection for all  Electrical Contractors'
                         equipment, plant, motors and materials, fixed or unfixed, to prevent mechanical damage,
                         ingress of dirt, dust and/or moisture. Precautions must be taken and all protection
                         provided to safeguard the contract works during frosts and inclement weather.

                         All goods, plant, equipment and materials are to be adequately maintained in accordance
                         with the manufacturer's recommendations by the Electrical Contractor prior to Practical
                         Completion.
                         Any item damaged due to non compliance with this requirement is to be replaced by the

                         Electrical Contractor at his own expense.
                         The Electrical Contractor is to thoroughly clean out the interior of each item or section of
                         the contract works and plant immediately after execution of any work on that item or
                         section to the satisfaction of the Project Manager.

                         The Electrical Contractor is to thoroughly clean down the Contract Works in an approved
                         manner prior to Practical Completion and ensure that the Contract installation, including
                         all plant is free from dust, dirt, moisture and other foreign matter.

               1.2.44  Execution of the Contract Works

                         The  Electrical Contractor is to include for, supply, delivery to site, unloading, sorting,
                         hoisting, distributing, installing, fixing complete, setting to work, testing and
                         commissioning, proving the performance of the works and instruction of the Clients staff
                         all as detailed in the Tender documents and Contract Preliminaries.

                         The Electrical Contractor is not to vary the Contract Works without the written permission
                         of the Project Manager and is to carry out and complete the Contract Works in every
                         respect to the satisfaction of the Project Manager.

                         The Electrical Contractor is to proceed regularly and diligently with the Contract Works
                         and take all necessary measures to ensure that delays do not occur.

                         The Electrical Contractor must not sub-contract any part of the Contract Works without
                         prior acceptance by the Project Manager except as otherwise described in this document.
                         The Electrical Contractor is to take due notice of the assumed contract period detailed in
                         the main contract documents

                         It is a condition precedent to the submission of his Tender and entry into a formal
                         Contract, that the Electrical Contractor is to undertake the works strictly in accordance
                         with the Contractor's requirements as to progress, periods of execution of the Contract
                         Works and completion of such Contract Works, taking due notice of all site requirements.