GENERAL ELECTRICAL SPECIFICATION
Version 2014-2
Goods are to be ordered with protective packaging where applicable and these are to be
maintained in their position as long as possible.
The Electrical Contractor is to provide full protection for all Electrical Contractors'
equipment, plant, motors and materials, fixed or unfixed, to prevent mechanical damage,
ingress of dirt, dust and/or moisture. Precautions must be taken and all protection
provided to safeguard the contract works during frosts and inclement weather.
All goods, plant, equipment and materials are to be adequately maintained in accordance
with the manufacturer's recommendations by the Electrical Contractor prior to Practical
Completion.
Any item damaged due to non compliance with this requirement is to be replaced by the
Electrical Contractor at his own expense.
The Electrical Contractor is to thoroughly clean out the interior of each item or section of
the contract works and plant immediately after execution of any work on that item or
section to the satisfaction of the Project Manager.
The Electrical Contractor is to thoroughly clean down the Contract Works in an approved
manner prior to Practical Completion and ensure that the Contract installation, including
all plant is free from dust, dirt, moisture and other foreign matter.
1.2.44 Execution of the Contract Works
The Electrical Contractor is to include for, supply, delivery to site, unloading, sorting,
hoisting, distributing, installing, fixing complete, setting to work, testing and
commissioning, proving the performance of the works and instruction of the Clients staff
all as detailed in the Tender documents and Contract Preliminaries.
The Electrical Contractor is not to vary the Contract Works without the written permission
of the Project Manager and is to carry out and complete the Contract Works in every
respect to the satisfaction of the Project Manager.
The Electrical Contractor is to proceed regularly and diligently with the Contract Works
and take all necessary measures to ensure that delays do not occur.
The Electrical Contractor must not sub-contract any part of the Contract Works without
prior acceptance by the Project Manager except as otherwise described in this document.
The Electrical Contractor is to take due notice of the assumed contract period detailed in
the main contract documents
It is a condition precedent to the submission of his Tender and entry into a formal
Contract, that the Electrical Contractor is to undertake the works strictly in accordance
with the Contractor's requirements as to progress, periods of execution of the Contract
Works and completion of such Contract Works, taking due notice of all site requirements.