Where information on the services in any area is not provided, it is the responsibility of
the Electrical Contractor to select equipment, materials and components, suitable for the
application and thereafter design and install an adequate layout, with due consideration
of the usage of the space.
Any omission from the tender in this regard, are to be clearly and unequivocally stated
and highlighted within the tender submission.
The Electrical Contractor is to produce detailed working installation drawings, fully co-
ordinated in every respect in terms of distribution routes and equipment locations, with
the installation components etc., of all other services and building disciplines.
It is to be the responsibility of the Electrical Contractor to satisfy himself that all
mechanical plant and equipment sizes provided to him in the tender documentation are
of adequate size for the installations for which they serve. This is to include, but not
limited t0 AHUs, ducts, pipework, Fan coil units, etc.
It is to be the responsibility of the Electrical Contractor to satisfy himself that all
plantrooms and ducts/cupboards etc. shown for the routing/positioning of mechanical
services and equipment are adequate in size, (bearing in mind future access requirements
for maintenance) for the equipment they are intended to house.
The Electrical Contractor is to allow to take receipt of other contractors information and
attend meetings as necessary for the purpose of co-ordination, both in terms of design
and installation.
The Electrical Contractor is to be responsible for the accurate establishment of the
mounting height and finite location, in relation to the equipment served and the location
of other services, of all accessories or equipment forming part of the installation and is to
produce detailed, co-ordinated installation drawings where necessary as requested by
other members of the design/construct team.
The Electrical Contractor is to include for all works described in addendums issued
subsequently, as complementary documents to this specification, during the tender
period. Each addendum is to have a reference and the Electrical Contractor is to clearly
identify all the addendums received during the tender period and included within the
tender figure.
The works are to be installed to facilitate inspection, cleaning and repairs and for
operation in which safety and continuity of service is to be the first consideration. All
apparatus is to be designed to ensure satisfactory operation under the atmospheric
conditions prevailing and under such variations of load as may be met under working
conditions on the system.
The installation is to incorporate every reasonable precaution and provision for the safety
of all those concerned in the operation and maintenance of the works and associated