Page 9 - Bernardon Response to Request for Proposal-Dennis Farm
P. 9

Proposal for Professional Architectural Design Services                  February 11, 2021
                    Dennis House Restoration and Reconstruction                                         Page 7


                          1.B.2    CONSTRUCTION DOCUMENTS
                           A.  Prepare  Construction  Documents:    Based  on  the  approved  Design  Development
                               Submission,  the  Design  Team  shall  prepare  Construction  Documents  for  competitive
                               construction bidding of the Project. The base Construction Documents shall include the
                               following:

                               · Fully dimensioned and noted floor plans of each level;

                               · Reflected ceiling plans illustrating lighting, emergency, and mechanical devices;

                               · Detailed elevations of each exterior face of the building;

                               · Typical wall sections illustrating materials and methods;

                               · Two (2) detailed building sections;

                               · Construction details as required to illustrate the work;

                               · Door and window schedules;

                               · Room finish schedule;

                               · General construction notes;

                               · Structural  information/framing  diagrams  of  each  level  and  roof  (not  intended  for

                                   actual lumber count);
                               · Mechanical, electrical, and plumbing plans, with details as required;

                               · Division I CSI-format administrative specifications provided in MS Word format;

                                   and
                               · Short-form technical specifications provided on the drawings.

                           B.  Review  Agency  Approvals:    The  Design  Team  shall  coordinate  the  project  approval
                               requirements with the local agencies having review authority over applicable building
                               and  construction  codes.  Final  Building  Permits  shall  be  obtained  by  the  construction
                               contractor.

                           C.  Interim  Construction  Documents  Review:    Submit  the  construction  documents  to  the
                               DFCLT  for  review  when  they  are  approximately  75  %  complete.  Subsequently,  the
                               Design Team shall attend a meeting with the DFCLT to discuss the project status and
                               confirm that the design of the Project meets the requirements of the DFCLT.
                           D.  Estimate of Probable Cost:  The Design Team, in association with our cost consultant
                               ICI, shall prepare a final estimate of probable cost and submit it to the DFCLT with the
                               completed Construction Documents.

                           E.  Construction Documents Review Meeting:  Meet with the DFCLT at the conclusion of
                               the  Construction  Documents  Phase  for  review  and  approval  of  the  Construction
                               Documents and the cost estimate.