TIMOTHY OSBORNE, PE




          SENIOR ELECTRICAL PROJECT MANAGER



       Tim is a Senior Electrical Project Manager and has over 40 years of

       experience working in the Electrical Design and construction fields.
       His expertise is in electrical design including: power distribution,

       short circuit/volt drop calculation, interior/exterior lighting,
       emergency generator, fire alarm, security and computer systems.

                                                                                                              Electrical
                                                                                              TOsborne@PEServices.org
                                                                                                          717-781-2281

       Education                      Registrations                     Training and Certifications
       2003, B.S., Electrical Engineering,   Pennsylvania               Distribution, Lighting, Field Surveys, Arc Flash Studies.
       Pennsylvania State University

       Respective Projects Include:
       Kroger Automated Cold Storage Distribution Warehouse, Multiple locations- MD & WI: Paragon provided MEP services
       for a 320,000 sq. ft. facility with offices, conditioned storage, refrigerated storage, and van maintenance areas. This project
       also included the renovation of a 300,000 sq. ft. existing warehouse. Electrically, the project included 6 megawatts of
       primary electrical service with full parallel generator back-up. Led lighting with automatic controls. Power coordination and
       connections to robotic automatic fulfillment and conveying equipment. Full integrated fire alarm system. Delivery van
       refrigeration connections in parking areas and site lighting.
       Gordon Foods Distribution Centers, Multiple locations – Pittsburgh PA – Atlanta GA – Charlotte NC- This project included
       MEP design build, BIM modeling and LEED services for a 415,000 sq. ft. new distribution center and a 20,000 sq. ft. new
       vehicle maintenance building with 41,000 sq. ft. of office spaces, 234,000 sq. ft. of refrigerated spaces, and 160,000 sq. ft.
       of storage, and maintenance and utility areas. The electrical design included primary power service, parallel generators for
       normal and emergency backup of the entire building, power for refrigeration systems, conveyor systems, HVAC, lighting,
       and site lighting.  Electrical systems included phone and data distribution and coordination, fire alarm, and card access.
       Amazon Distribution Center, Perryville, MD- This project included MEP design services for a 1.1 million sf design build
       warehouse facility.  Interior lighting design included high bay LED type light fixtures with individual occupancy sensors for
       each fixture and exterior wall and pole mounted LED light fixtures with timeclock and photocell control. A generator was
       installed powered emergency and exit light fixtures as required to meet life safety code requirements. Electrical power

       distribution design included an underground 277/480volt – 3phase power company service with multiple switchboards and
       a fire pump installation. Step-down transformers were provided for sub-panel to feed 120/208volt – 3phase distribution
       panels. A fire alarm system was provided with initiation and signaling devices located as required by code. Hydrogen fuel
       cells were used to power the forklifts. A lightning protection system was installed.